Facebook Pixel Image
Skip to content
Mobile CDOT Logo
  • Home
  • Travel
  • News
  • Safety
  • Performance
  • Business
  • Programs
  • Projects
  • About CDOT
  • Site Directory Site Directory
    • A
    • Annual Reports
    • K
    • KForms
  • Spanish
  • Chinese (Simplified)
  • Vietnamese
CDOT Logo
Projects
You are here:
  1. Home
  2. Projects
  3. Studies
  4. I-270 Corridor Improvements Study
  5. Photo Gallery
Quick Links
  • Related Projects & Studies
  • Public Outreach
  • Frequently Asked Questions
  • Bridges
  • Upcoming EventsNotice of Intent

Photo Gallery http://www.codot.gov/projects/studies/i270study/photo-gallery http://www.codot.gov/@@site-logo/siteLogo.png

Photo Gallery

Emergency maintenance activities to fix the failure cause significant safety concerns to workers and lengthy travel delays to the traveling public. thumbnail image Emergency maintenance activities to fix the failure cause significant safety concerns to workers and lengthy travel delays to the traveling public.
I-270 Bridge Deck Failure at WB I-270 over the Burlington Canal causes emergency closure. thumbnail image I-270 Bridge Deck Failure at WB I-270 over the Burlington Canal causes emergency closure.
Aerial photo of the many instances of I-270 bridge deck patching at the Burlington Canal that necessitated expensive resurfacing. thumbnail image Aerial photo of the many instances of I-270 bridge deck patching at the Burlington Canal that necessitated expensive resurfacing.
Bridge rail deterioration impacts overall structure safety and integrity at the WB I-270 over 60th Ave and BNSF spur Structure. thumbnail image Bridge rail deterioration impacts overall structure safety and integrity at the WB I-270 over 60th Ave and BNSF spur Structure.
270BridgeDeck-BurlingtonCanal (1).jpg thumbnail image 270BridgeDeck-BurlingtonCanal (1).jpg
270BridgeRepair-BrightonBlvd.jpg thumbnail image 270BridgeRepair-BrightonBlvd.jpg
270Bridge-BrightonBlvd.jpg thumbnail image 270Bridge-BrightonBlvd.jpg
270Bridge-BrightonBlvd2.jpg thumbnail image 270Bridge-BrightonBlvd2.jpg
270BridgeDeck-SPlatte.jpg thumbnail image 270BridgeDeck-SPlatte.jpg
270BridgeDeck-Repair.jpg thumbnail image 270BridgeDeck-Repair.jpg

Contact Us

Project Hotline:
303-512-4270

Project Email: 
[email protected]

Upcoming Events

« May 2025 »
month-5
Su Mo Tu We Th Fr Sa
27 28 29 30 1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 27 28 29 30 31
I-270 Study Feedback Forms

I-270 Improvements Project Feedback Form

Photo Gallery

I-270 Study Photos

Stay Informed

Travel Alerts logo/image

Contact Us Contact Us Phone Icon 511 Icon
  • © 2024 State of Colorado
  • Accessibility
  • Privacy Statement
  • Security Statement
  • Transparency Online
Colorado Portal Logo